Week 3: Plumbing service lines and the new footing

We ran new insulated PEX (cross-linked polyethylene)  from the main house for the radiant heat (supply and return lines), potable hot water (with a return line for hot water recirculation) and potable cold water.  The wrapped pipe on the left is a gas pipe which we removed since Puget Sound Energy will be setting up a seperate gas meter for the new house.  Yann Buchanan
Kaleb setting up the footings.
Footings poured