| After having installed rebar, Kaleb and Cecillio install the PEX tubing |
![]() |
| Setting up the hydronic heating manifold for a temporary pressure test during the concrete slab pour |
| Tubing in place |
| After being told that the drivers were going on strike, we finally get concrete and begin the pour. |
| "Rodding" the concrete to get a preliminary leveling. |
| Jason from All Aspects Concrete using the bull float to further level the concrete. |
| Hard troweling for the final smooth finish. |
![]() |
| No sun on this day except for my cool new patio drain. |