week 6: Rebar, PEX and the new slab

After having installed rebar, Kaleb and Cecillio install the PEX tubing
Setting up the hydronic heating manifold for a temporary pressure test during the concrete slab pour
Tubing in place

After being told that the drivers were going on strike, we finally get concrete and begin the pour.
"Rodding" the concrete to get a preliminary leveling.

Jason from All Aspects Concrete using the bull float to further level the concrete.
Hard troweling for the final smooth finish.





No sun on this day except for my cool new patio drain.